Close

DLBA COMMERCIAL NEWS

Norfolk Dredge Incline Experiment

APRIL 21, 2021

DLBA’s Director of Workboats, Jonathan Soja, led DLBA’s largest incline experiment to date in March, 2021 in tandem with Norfolk Dredging Company. The experiment was performed to determine the vessel weight and center of gravity for U.S. Coast Guard stability calculations, load line calculations, and U.S. Army Corps of Engineers’ Naval Architecture Analyses of the lifting equipment.  This experiment was conducted on the 40 CY Clamshell Dredge named “Baltimore” which is 200’ long and 80’ wide and has a displacement of 4,400 kips. Crofton Industries provided the floating crane necessary to move the weights including a steel stack weighing 98 kips and two water tanks at 61 kips each. After 7 hours, the experiment was complete and successful.

Play Video

Share this article online:

Share on facebook
Share on linkedin
Share on twitter
Share on whatsapp
HOW CAN WE HELP YOU?
FEEL FREE TO CONTACT US

DLBA Naval Architects

860 Greenbrier Circle, Suite 201  Chesapeake, Virginia 23320 USA

Phone: 757-545-3700  |  Fax: 757-545-8227  | dlba@gibbscox.com

STAY UPDATED

SIGN UP FOR OUR NEWSLETTER

Keep your finger on the pulse of the latest points of focus in naval architecture and engineering: subscribe to DLBA’s concise monthly newsletter. Within it, we briefly describe and picture our latest projects and concepts. We encourage feedback and seek to have our newsletter spark conversation regarding potential collaborations and further advancements as we share our passion for the industry.